| CNS
Fibre Optic Cable Project |
 |
The
CNS Fibre Optic Project involved the installation of a high
integrity fibre optic link connecting the land terminal at
Cruden Bay to the Forties Charlie Platform, North Everest
Platform and Ula Platform. When cable faults occurred during
pre installation trials ETA were commissioned as cable specialists
to review all technical aspects of the project and then worked
closely with Stolt Offshore to ensure a successful installation.

|
| Shell
Odidi -AGG Project |
 |
The
project involved the installation of five cable links as part
of the Shell Associated Gas Gathering (AGG) System.ETA provided
all the personnel and equipment including Project Management,
equipment design, equipment build and equipment operators.

|
| PEC
& Level 3 Project |
 |
ETA
managed the installation of two cross channel cables for Alcatel
Submarine Networks (ASN) on behalf of CTC Marine Projects.
The Pan European Crossing (PEC) is part of Global Crossing's
network. The 'Tangerine' cable connects the UK with the rest
of Level 3's global submarine cable network.

|
| Sirius
Cable System |
 |
The
Sirius cable system is a fibre optic ring system with two
submarine segments which link Northern Ireland and Eire with
the UK. The system was supplied and installed by Pirelli under
a turnkey survey / supply / install contract. ETA were appointed
by ntl to project manage the turnkey contract.

|
| TAT
14 |
 |
The
TAT14 system links the United States to the United Kingdom,
France, The Netherlands, Germany, and Denmark. The cable system
is a dual, bi-directional ring configuration using DWDM multiplexing
with 16 wavelengths of STM-64 per fiber pair. It has a dual
route, transatlantic capacity of 640 Gbits on 2 service fiber
pairs backed up by 2 protection fiber pairs.

|
| Lewis
Wind Power |
|
 |
ETA
were selected by Lewis Wind Power (LWP) to identify potential
grid connection points and subsea cable routes to link the
proposed Isle of Lewis windfarm to the UK mainland. The potential
capacity of the sub-sea cable was required to be in the range
of 600-1200MW, with multiple cable configurations to be considered.
Key to ETA's selection was the depth of knowledge demonstrated
during the tender process, technical approach, and the ability
to provide outputs in formats compatible with the client's
GIS software.

|
| Cable
Transfer |
 |
ETA
have been involved in a number of projects for the loading
and transferring of both telecom cable including repeaters
and power cable.

|
| Huizhou
Developement |
 |
The
CACT Operators Group is expanding the Huizhou field located
in the South China Block 16/08. The project is a platform
based oil and gas development with export pipelines to a Floating
Production, Storage and Offloading (FSPO) facility.
|
|
Top
|
| |
|
| |
| |
|